
We’re #1 Official Installation Partner

Rheem Water Heater
The No.1 American Water Heater Brand in Singapore
An American company with nearly 100 years in business, Rheem has been a pioneer in developing some of the most innovative advancements in water heating. With a long list of award-winning solutions, Rheem continues to deliver advanced comfort, savings, and experiences to the customers.
Since 1st April 2018, the installation or replacement of an electric storage heater must be carried out or supervised by a PUB LicensedĀ Plumber.

INSTALLATIONS
We have done replacement and installation for more than 5,000Ā water heaters.
Across different singapore households like Condominium, HDB, Apartment and also landed houses.

Rubine MT-30 water heater replacement with Rheem EHG-30 water heater at Whitewater on 23 Mar 2024

Rheem EH-100M water heater replacement with Rheem EHG-50 water heater at a landed house at Westwood Avenue on 23 May 2024

AOS15 Gallon Horizontal replacement with EHG-40 water heater at a commercial building at Balestier Road on 25 April 2024

Looking to replace your water heater?
Look through our best selling water heaters listing for a good recommendation!
Recent water heater installations
Our Projects

1 King Albert Park
Completion Year: 1997
Total Unit: 101
Floor: NA
Model: Rheem 65SVP10S
Piping: to update

3 Orchard By-The-Park
Completion Year: 2017
Total Unit: 77
Floor: 25
Model: Rheem EHG-80
Piping: to update

8 Raja
Completion Year: 2013
Total Unit: 26
Floor: 15
Model: Rheem EH-40M
Piping: PPR

Adam Park Condominium
Completion Year: 2004
Total Unit: 118
Floor: 5
Model: Rheem EP15-H
Piping: to update

Amaranda Gardens
Completion Year: 2004
Total Unit: 187
Floor: 17
Model: Rheem EHG-40M
Piping: to update

Ardmore Park
Completion Year: 2001
Total Unit: 330
Floor: NA
Model: Rheem 85VP20S
Piping: Copper

Ballota Park Condo
Completion Year: 2000
Total Unit: 365
Floor: 8
Model: Rheem 65SVP10S
Piping: to update

Banyan Condo
Completion Year: 1995
Total Unit: 104
Floor: 4
Model: Rheem 65SVP10S
Piping: Copper

Bartley Residences
Completion Year: 2015
Total Unit: 702
Floor: 17
Model: Rheem EH-55M
Piping: PPR

Beacon Heights
Completion Year: 2012
Total Unit: 212
Floor: 28
Model: Rheem EH-40MĀ
Piping: to update

Bishan Park Condo
Completion Year: 1994
Total Unit: 320
Floor: 10
Model: Rheem 85VP6S
Piping: Copper

Blu Coral Condo
Completion Year: 2011
Total Unit: 79
Floor: 5
Model: Rheem EH-40MĀ
Piping: to update

Butterworth 8
Completion Year: 2004
Total Unit: 216
Floor: 18
Model: Rheem EP15-H
Piping: Copper

Cairnhill Crest
Completion Year: 2004
Total Unit: 248
Floor: 18
Model: Rheem EP15-H
Piping: Copper

Camelot By The Water
Completion Year: 2001
Total Unit: 99
Floor: 20
Model: Rheem 85VP20S
Piping: Copper

Caribbean at Keppel Bay
Completion Year: 2004
Total Unit: 969
Floor: 10
Model: Rheem EP15-H
Piping: to update

Carissa Park Condo
Completion Year: 2003
Total Unit: 528
Floor: 8
Model: Rheem 85VP6S & 65SVP15S
Piping: to update

Casa Pasir Ris
Completion Year: 2000
Total Unit: 224
Floor: 4
Model: Rheem 65SVP10S
Piping: to update

Casafina
Completion Year: 2000
Total Unit: 224
Floor: 4
Model: Rheem 85VP6S
Piping: Copper

Cashew Heights
Completion Year: 1992
Total Unit: 596
Floor: NA
Model: RheemĀ 85VP6S
Piping: Copper

Castle Green
Completion Year: 1997
Total Unit: 664
Floor: 13
Model: RheemĀ 85VP6S
Piping: Copper

Chiltern Park
Completion Year: 1995
Total Unit: 500
Floor: 10
Model: RheemĀ 85VP6S
Piping: to update

Clementi Park
Completion Year: 1985
Total Unit: 489
Floor: 10
Model: RheemĀ 85VP6S
Piping: to update

Corals at Keppel Bay
Completion Year: 2016
Total Unit: 336
Floor: 10
Model: RheemĀ EHG-40
Piping: PPR

Corona Ville
Completion Year: 1982
Total Unit: 41
Floor: NA
Model: RheemĀ 65SVP15S
Piping: to update

Dahlia Park Condo
Completion Year: 2004
Total Unit: 299
Floor: 8
Model: Rheem 85VP6S
Piping: to update

Double Bay Residences
Completion Year: 2012
Total Unit: 646
Floor: 13
Model: Rheem EH40M
Piping: to updat

Dover Parkview
Completion Year: 1997
Total Unit: 686
Floor: 16
Model: Rheem 65SVP10S
Piping: to update

Eastpoint Green
Completion Year: 1998
Total Unit: 684
Floor: 10
Model: Rheem 85VP20S
Piping: to update

Edelweiss Park Condo
Completion Year: 2006
Total Unit: 517
Floor: 8
Model: Rheem EH-25M
Piping: to update

Elizabeth Tower
Completion Year: 1980
Total Unit: 80
Floor: NA
Model: Rheem 65SVP10S
Piping: to update

Estella Gardens
Completion Year: 1999
Total Unit: 350
Floor: 8
Model: Rheem EH-40M
Piping: to update

Euphony Gardens
Completion Year: 2002
Total Unit: 304
Floor: 4
Model: Rheem 65SVP10S
Piping: Copper

Ferraria Park Condo
Completion Year: 2010
Total Unit: 475
Floor: 8
Model: Rheem EH-55M
Piping: to update

Finland Gardens
Completion Year: 1989
Total Unit: 48
Floor: NA
Model: Rheem 85VP6S
Piping: Copper

Goldenhill Park Condo
Completion Year: 2010
Total Unit: 475
Floor: 8
Model: Rheem EHG-40
Piping: Stainless Steel

Grange Residences
Completion Year: 2004
Total Unit: 164
Floor: 18
Model: Rheem EP-20H
Piping: to update

Guilin View
Completion Year: 2000
Total Unit: 655
Floor: 30
Model: Rheem 65SVP10S
Piping: Copper

Hazel Park
Completion Year: 2000
Total Unit: 696
Floor: 19
Model: Rheem EH-40M
Piping: to update

Hedges Park Condominium
Completion Year: 2015
Total Unit: 501
Floor: 8
Model: Rheem EH-55M
Piping: to update

Heritage View
Completion Year: 2000
Total Unit: 618
Floor: 20
Model: Rheem EHG-30
Piping: Copper

High Park Residences
Completion Year: 2000
Total Unit: 618
Floor: 20
Model: Rheem EHG-60
Piping: to update

Hillbrooks
Completion Year: 1999
Total Unit: 299
Floor: 10
Model: Rheem 65SVP10S & 65SVP15S
Piping: to update

Hillcrest Arcadia
Completion Year: 1980
Total Unit: 272
Floor: NA
Model: Rheem 65SVP10S
Piping: PPR

Hillview Park
Completion Year: 1995
Total Unit: 184
Floor: NA
Model: Rheem 65SVP10S
Piping: to update

Horizon Towers
Completion Year: 1984
Total Unit: 210
Floor: 18
Model: Rheem 85VP20S
Piping: to update

Hume Park II
Completion Year: 1997
Total Unit: 328
Floor: 10
Model: Rheem 65SVP10S
Piping: to update

J Gateway
Completion Year: 2017
Total Unit: 738
Floor: 38
Model: Rheem EH-40M
Piping: to update

KAP Residences
Completion Year: 2017
Total Unit: 142
Floor: 7
Model: Rheem EHG-30 & EHG-60
Piping: PPR

Kingsford Waterbay
Completion Year: 2018
Total Unit: 1165
Floor: NA
Model: Rheem EHG-40
Piping: PPR

Kovan Regency
Completion Year: 2016
Total Unit: 393
Floor: 14
Model: Rheem EHG-50
Piping: to update

Lake Grande
Completion Year: 2020
Total Unit: 710
Floor: NA
Model: Rheem EHG-60
Piping: to update

Landridge Condo
Completion Year: 1993
Total Unit: 72
Floor: 3
Model: Rheem 85VP6S
Piping: to update

Leonie Gardens
Completion Year: 1993
Total Unit: 138
Floor: NA
Model: Rheem 65SVP10S
Piping: to update

Mandalay Towers
Completion Year: 1974
Total Unit: 56
Floor: NA
Model: Rheem 65SVP10S
Piping: to update

Maysprings
Completion Year: 1998
Total Unit: 636
Floor: 24
Model: Rheem 65SVP10S
Piping: Copper

Merawoods
Completion Year: 1999
Total Unit: 305
Floor: 10
Model: Rheem 65SVP10S
Piping: to update

Mirage Tower
Completion Year: 1997
Total Unit: 248
Floor: 33
Model: Rheem 65SVP10S
Piping: to update

Montview
Completion Year: 2008
Total Unit: 115
Floor: 24
Model: Rheem EH-55MĀ
Piping: to update

Mount Sophia Suites
Completion Year: 2011
Total Unit: 50
Floor: NA
Model: Rheem EH-75M
Piping: to update

Nineteen Shelford
Completion Year: 1997
Total Unit: 256
Floor: 10
Model: Rheem 85VP6S
Piping: Copper

Northvale
Completion Year: 1998
Total Unit: 762
Floor: 12
Model: Rheem 65SVP15S
Piping: to update

One Chatsworth
Completion Year: 1976
Total Unit: 45
Floor: NA
Model: Rheem 85VP20S
Piping: to update

Orange Grove Residences
Completion Year: 2009
Total Unit: 60
Floor: 5
Model: Rheem EH-25M
Piping: PPR

OUE Twin Peaks
Completion Year: 2015
Total Unit: 462
Floor: 36
Model: Rheem EH-40M
Piping: to update

Parc Oasis
Completion Year: 1995
Total Unit: 950
Floor: NA
Model: Rheem 65SVP10S
Piping: Copper

Parc Riviera
Completion Year: 2000
Total Unit: 234
Floor: 7
Model: Rheem EHG-40
Piping: Copper

Parc Rosewood
Completion Year: 2014
Total Unit: 689
Floor: NA
Model: Rheem 65SVP10S
Piping: Copper

Park Infinia at Wee Nam
Completion Year: 2008
Total Unit: 486
Floor: 31
Model: Rheem EH-40M
Piping: to update

Pinehurst Condo
Completion Year: 2008
Total Unit: 486
Floor: 31
Model: Rheem 85VP6S
Piping: to update

Poets Villas
Completion Year: 201
Total Unit: 40
Floor: 1
Model: Rheem EH-40M
Piping: Stainless Steel

Reflections at Keppel Bay
Completion Year: 2013
Total Unit: 1129
Floor: 40
Model: Rheem EH-75M
Piping: PPR

Regent Residences
Completion Year: 2016
Total Unit: 180
Floor: 26
Model: Rheem EH-40M
Piping: to update

Residences @ Evelyn
Completion Year: 2007
Total Unit: 208
Floor: 33
Model: Rheem 65SVP15S
Piping: to update

Ris Grandeur
Completion Year: 2006
Total Unit: 453
Floor: 17
Model: Rheem EH-40M
Piping: to update

Sant Ritz
Completion Year: 2016
Total Unit: 214
Floor: 19
Model: Rheem EH-40M
Piping: to update

Sea Avenue Residences
Completion Year: 2006
Total Unit: 30
Floor: 5
Model: Rheem EH-55M
Piping: to update

Selanting Green
Completion Year: 1999
Total Unit: 60
Floor: 10
Model: Rheem 65SVP10S
Piping: Copper

Seletarisā
Completion Year: 2001
Total Unit: 328
Floor: 4
Model: Rheem 65SVP10S & 65SVP10S
Piping: Copper

Sims Urban Oasis
Completion Year: 2017
Total Unit: 1024
Floor: NA
Model: Rheem EH-40M
Piping: PPR

Simsville
Completion Year: 1998
Total Unit: 522
Floor: 16
Model: Rheem 65SVP15S
Piping: to update

Sky Green
Completion Year: 2016
Total Unit: 176
Floor: 15
Model: Rheem EH-55M
Piping: Stainless Steel

Southbank
Completion Year: 2009
Total Unit: 197
Floor: 39
Model: Rheem 85VP6S
Piping: to update

Stratford Court
Completion Year: 2000
Total Unit: 268
Floor: 4
Model: Rheem 85VP6SĀ
Piping: Copper

Springdale Condo
Completion Year: 2000
Total Unit: 480
Floor: 10
Model: Rheem EHG-50
Piping: to update

Stratum
Completion Year: 2016
Total Unit: 380
Floor: 5
Model: Rheem 85VP6S
Piping: to update

Studio8
Completion Year: 2014
Total Unit: 35
Floor: NA
Model: Rheem EH-40M
Piping: to update

Symphony Heights
Completion Year: 1998
Total Unit: 449
Floor: 10
Model: Rheem 81VP10S
Piping: Copper

The Anchorage
Completion Year: 1997
Total Unit: 775
Floor: 19
Model: Rheem 65SVP10SĀ
Piping: Copper

The Ansley
Completion Year: 2004
Total Unit: 100
Floor: 25
Model: Rheem EHG-50Ā Ā
Piping: StainlessĀ

The Balmoral
Completion Year: 1986
Total Unit: 81
Floor: 8
Model: Rheem 65SVP15S
Piping: to update

The Blossomvale
Completion Year: 1999
Total Unit: 220
Floor: 8
Model: Rheem 65SVP15S
Piping: to update

The Boulevard Residence
Completion Year: 2005
Total Unit: 46
Floor: 36
Model: Rheem 65SVP15S
Piping: to update

The Clearwater
Completion Year: 2017
Total Unit: 469
Floor: 23
Model: Rheem 65SVP15S
Piping: to update

The Coast at Sentosa Cove
Completion Year: 2010
Total Unit: 249
Floor: 8
Model: Rheem EH-40M
Piping: PPR

The Crest
Completion Year: 2017
Total Unit: 469
Floor: 23
Model: Rheem EH-40M
Piping: to update

The Dairy Farm
Completion Year: 1989
Total Unit: 477
Floor: 9
Model: Rheem EH-25S
Piping: to update

The Estuary @ Yishun
Completion Year: 2013
Total Unit: 608
Floor: 17
Model: Rheem EH-40M
Piping: to update

The Foliage
Completion Year: 2008
Total Unit: 88
Floor: 5
Model: Rheem EH-55M
Piping: to update

The Glades
Completion Year: 2017
Total Unit: 726
Floor: NA
Model: Rheem EH-40M & 86H-40
Piping: PPR

The Grandhill
Completion Year: 2007
Total Unit: 53
Floor: 5
Model: Rheem EH-25 & EH-40M
Piping: Copper

The Hillside
Completion Year: 2001
Total Unit: 340
Floor: 10
Model: Rheem 81VP6S & 85VP6S
Piping: Copper

The Interweave
Completion Year: 2015
Total Unit: 169
Floor: 21
Model: Rheem EH-25M
Piping: Copper

The Lakefront Residences
Completion Year: 2014
Total Unit: 629
Floor: 17
Model: Rheem EH-40M
Piping: to update

The Luxurie
Completion Year: 2015
Total Unit: 622
Floor: 15
Model: Rheem EH-40M
Piping: to update

The Makena
Completion Year: 1998
Total Unit: 504
Floor: 28
Model: Rheem 61SVP10S
Piping: to update

The Skywoods
Completion Year: 2017
Total Unit: 240
Floor: 15
Model: Rheem EHG-40
Piping: to update

The Peak @ Balmeg
Completion Year: 2011
Total Unit: 180
Floor: 5
Model: Rheem EH-75M
Piping: to update

The Quintet
Completion Year: 2006
Total Unit: 459
Floor: NA
Model: Rheem EH-40M
Piping: Copper

The Sail @ Marina Bay
Completion Year: 2008
Total Unit: 1111
Floor: 69
Model: Rheem EH-40MĀ
Piping: to update

The Scala @ Lorong Chuan
Completion Year: 2013
Total Unit: 468
Floor: 17
Model: Rheem EHG-25S
Piping: PPR

The Terrace
Completion Year: 2018
Total Unit: 747
Floor: NA
Model: Rheem 65H-56
Piping: to update

The Trevose
Completion Year: 2001
Total Unit: 142
Floor: NA
Model: Rheem 85VP6S
Piping: to update

The Trilinq
Completion Year: 2017
Total Unit: 755
Floor: 36
Model: Rheem EH-40M
Piping: to update

Trevose Park
Completion Year: 1991
Total Unit: 150
Floor: 5
Model: Rheem 85VP6S
Piping: to update

Varsity Park Condominium
Completion Year: 2008
Total Unit: 530
Floor: NA
Model: Rheem EH-55M
Piping: Copper

Versilia On Haig
Completion Year: 2010
Total Unit: 128
Floor: 18
Model: Rheem EH-40M
Piping: to update

Windy Heights
Completion Year: 1978
Total Unit: 200
Floor: 14
Model: Rheem 85VP6S
Piping: to update

Woodgrove Condo
Completion Year: 1999
Total Unit: 248
Floor: 4
Model: Rheem 65SVP15S
Piping: to update

Yishun Emerald
Completion Year: 2002
Total Unit: 436
Floor: 16
Model: Rheem 65SVP10S
Piping: to update
Rheem Online Shop
-
Rheem 85VP6S 23L Storage Water Heater
Rheem 85VP6S 23L Storage Water Heater Design for HDB, BTO, Condo & Landed$330.00 -
Rheem 65SVP10S 38L Storage Water Heater
Rheem 65SVP10S 38L Storage Water Heater Design for HDB, BTO, Condo & Landed$350.00 -
Rheem 65SVP15S 56L Storage Water Heater
Rheem 65SVP15S 56L Storage Water Heater Design for HDB, BTO, Condo & Landed$390.00 -
Rheem 85SVP20S 76L Storage Water Heater
Rheem 85SVP20S 76L Storage Water Heater Design for HDB, BTO, Condo & Landed$500.00 -
Rheem 85SVP30S 114L Storage Water Heater
Rheem 85SVP30S 114L Storage Water Heater Design for HDB, BTO, Condo & Landed$550.00 -
Rheem EH 25M Electric Storage Water Heater
Singapore Safety #1 PUB Licensed Replacement, Installation & Repair Suitable for 2 to$300.00 -
Rheem EH 40M Electric Storage Water Heater
Singapore Safety #1 PUB Licensed Replacement, Installation & Repair Suitable for 4 to$320.00 -
Rheem EH 55M Electric Storage Water Heater
Singapore Safety #1 PUB Licensed Replacement, Installation & Repair Suitable for above 5$350.00

What are the warranty periods for Rheem water heaters?
- Rheem Xwell Series (XC & XS) (Warranty: 8 years for inner tank, 2 years for spare parts)
- Rheem EHG Series (Warranty: 5 years for inner tank, 1 year for spare parts)
- Rheem RCY Series (Warranty: 5 years for inner tank, 1 year for spare parts)
- Rheem EH-M Series (Warranty: 3 years for linner tank, 1 year for spare parts)
- Rheem Vertical Tank VP Series (Warranty: 3 years for inner tank, 1 year for spare parts)
Our Homeone service includes an engineering warranty for parts and labour. The leak-proof warranty is provided by the manufacturer.
What are the lifespans of Rheem water heaters?
You can expect the average lifespan of each series of Rheem water heaters to exceed the manufacturer’s warranty by more than 3 years. Here’s how long each series typically lasts:
- Rheem Xwell Series (XC & XS): Typically lasts around 11 years.
- Rheem EHG Series: Typically lasts around 8 years.
- Rheem RCY Series and Rheem RCY-30: Typically lasts around 8 years.
- Rheem EH-M Series: Typically lasts around 6 years.
- Rheem Vertical Tank VP Series: Typically lasts around 6 years.
Why is my Rheem water heater not heating water?
If you own a Rheem electric water heater and you do not have hot water, check the breaker to check if it has tripped unexpectedly. If it has, reset the circuit, and your water heater should continue to operate normally. If there were no power disturbances, the heating element may be at fault.
Why is my Rheem water heater tripping the circuit breaker?
There are several reasons why your Rheem water heater may be tripping the circuit breaker:
- Faulty Thermostat or Heating Element: A malfunctioning thermostat or heating element can cause the water heater to overheat, which can trip the circuit breaker as a safety measure.
- Incorrect Wire Size: Using wires that are not the correct size for the water heater can lead to overheating of the wires, which can also trip the breaker.
- Illegal Power Source Usage: Sharing the water heaterās power source with another load can overload the circuit, causing the breaker to trip.
- Faulty Junction Box, Isolator: A malfunctioning junction box can lead to electrical faults that trip the breaker. If the isolator switch is faulty, it can cause power surges or interruptions, leading to tripping.
- Malfunctioning Rheem Water Heater Switch: A faulty heater switch can result in intermittent electrical connections, which can trip the breaker.
What are the most common causes of noises in a Rheem water heater?
- High Water Pressure: High Water Pressure: Excessively high water pressure can cause pipes and the water heater to make noise, including a phenomenon known as water hammer.
- Loose Pipe Connections: If the pipes connected to the water heater are not properly secured, they can rattle or vibrate, especially when water flows through them.