26B Jalan Membina
HDB
A homeowner at an HDB flat contacted Homeone after experiencing repeated issues with their Rinnai REU-55CGL Gas Water Heater HDB, including water leakage from the internal tank and connecting pipes. With the heater in service for over 17 years and showing clear signs of corrosion, the risks of continued use were significant. Our licensed gas service team carried out a thorough inspection to identify the extent of the faults and advised that a full replacement would be the safest and most reliable long-term solution.
Old gas heater:
Rinnai REU-55CGL
New gas heater:
Macro MA-10FE


A homeowner at 26B Jalan Membina contacted Homeone Engineering after their Rinnai REU-55CGL Gas Water Heater HDB stopped producing hot water. Our licensed specialists conducted a thorough site inspection and found the following issues:
No Hot Water Output – The heater had completely failed and was no longer functioning.
Over 17 Years Old – The serial number confirmed the heater was far beyond its typical lifespan, making it unsafe and inefficient.
Rusty Fittings – The connected water and gas pipes fittings showed advanced rust and corrosion, creating reliability and safety concerns.
Corroded Safety Valves – The gas valve and water stop valve were hard to operate due to corrosion, posing operational risks.
With these findings, the old Rinnai HDB gas heater model was deemed beyond repair. The homeowner opted for a Macro MA-10FE Indoor Gas Water Heater HDB, a reliable and widely used replacement model in Singapore HDB flats.
All works were supervised out by Homeone ’s Licensed Gas Service Workers (LGSWs) in compliance with EMA safety standards, PUB regulations, and the Gas Supply Regulations of Singapore.
Supplied and installed a new Macro MA-10FE Gas Heater Powered by Citygas
Replaced leaking pipes and fittings with PUB-approved components
Replaced the faulty stop valve for long-term safety
Installed a new control panel for efficient operation
Connected new electrical wiring to the isolator
Installed protective equipotential bonding in line with safety regulations
Performed full testing and commissioning of the new heater
Issued a Final Pressure test certificate by a Licensed Gas Service Worker, as required by Singapore’s Gas Supply Regulation
The Rinnai REU-55CGL Gas Water Heater HDB had exceeded its expected service lifespan of over 17 years. With complete failure, corroded piping, and discontinued market availability, keeping the unit in service was neither safe nor practical.
By upgrading to the Macro MA-10FE Indoor Macro HDB Gas Heater Model, the homeowner now benefits from:
✅ Reliable hot water supply
✅ Safe and efficient operation
✅ Installation in compliance with PUB and EMA standards
✅ Long-term peace of mind with warranty coverage
Upon completion, you receive a Statement of Gas Appliances Testing Certificate immediately. This critical document confirms:
✓ Installation complies with Singapore Standard SS 608:2024 – Code of Practice for Gas Installations
✓ Installation meets Gas Supply Regulations 21 requirements
✓ The gas heater and entire house gas piping have been tested
✓ No gas escapes exist and the system is safe to use
Insurance policies do not cover any damage or injury caused by regulated work carried out by an unlicensed handyman without a valid Statement of Gas Appliances Testing Certificate. Working with licensed professionals protects both your safety and your financial interests.
Insurance policies do not cover any damage or injury caused by regulated work carried out by an unlicensed handyman without a valid Statement of Gas Appliances Testing Certificate. Working with licensed professionals protects both your safety and your financial interests.
When an HDB gas water heater model reaches the end of its lifespan—especially with corrosion, valve issues, or discontinued parts—it’s critical to replace it promptly.
The replacement of the Rinnai REU-55CGL with a Macro MA-10FE Indoor Gas Water Heater HDB at 26B Jalan Membina ensured continued safe hot water supply, full compliance with Singapore’s regulations, and peace of mind for the homeowner.
Project Location: 26B Jalan Membina
Table of Contents