HDB Rewiring 3 Rooms
Job Scope
Compliance
- EMA Licensed & HDB Authorised
- SS 638:2018 Code of Practice for Electrical Installations
- Whole House Rewiring 3 Rooms
- Submission of CS/5H
- Electrical Plan Drawing
- SS 638:2018 Approved Materials
DB Box
- To Install and Supply a new RCCB
- To Install and Supply a DP MCB
- To Install and Supply a 20A MCB for Water Heater
- To Install and Supply a 10A MCB x 3 PCS for Lighting
- To Install and Supply a 16A MCB x 5 PCS for Power Socket
- To Install and Supply a 20A MCB x 1 PCS for Aircon
20A Water Heater Point
- 2.5mm2 wire from DB box to 20A Junction Box
- 20A Heater Switch
- 20A Junction box
20A Isolator Aircon Point
- 2.5mm2 wire from DB box to 20A Isolator
- 20A Isolator
Lighting Point
- 1.00mm wire from DB box to Lighting Point
- Excluded install light fitting
- 8 NOS
2 Gang 13A Power Point
- Supply and install Socket Outlet
- 2.5mm wire from DB box to Socket Outlet
- 8 NOS
1 Gang 13A Power Point
- Supply and install Socket Outlet
- 2.5mm wire from DB box to Socket Outlet
- 2 NOS
Our Range of Services at Homeone:
At Homeone Water Heater, we provide expert services for a wide range of gas and storage water heaters, ensuring optimal performance and longevity.
Reviews
There are no reviews yet.